Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Awil, A and Aziz, A R A (2002) International markets: Malaysian construction contractors and the stage theory. Construction Economics and Building, 2(01), 94-106.

El-Higzi, F (2002) Foreign market selection factors in the Australian construction services sector. Construction Economics and Building, 2(01), 107-120.

Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(01), 28-36.

Jefferies, M, Chen, S and Conway, J (2002) Assessment of professional competence in a construction management problem-based learning setting. Construction Economics and Building, 2(01), 47-56.

Lam, K C, Cheung, S O, Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(01), 81-93.

Ling, F and Leong, E (2002) Performance of design-build projects in terms of cost, quality and time: views of clients, architects and contractors in Singapore. Construction Economics and Building, 2(01), 37-46.

Manley, K and Marceau, J (2002) Integrated manufacturing-services businesses in the Australian building and construction sector. Construction Economics and Building, 2(01), 1-12.

Ng, T, Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(01), 70-80.

Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(01), 57-69.

  • Type: Journal Article
  • Keywords: Project managers; South Africa; health and safety; construction
  • ISBN/ISSN: 1445-2634
  • URL: https://doi.org/10.5130/AJCEB.v2i1.2887
  • Abstract:
    The paper reports on a study which investigates the influence of project managers (PMs),independent agents engaged by clients to manage and co-ordinate the design and constructionprocesses, on construction health and safety (H&S).Based upon a literature review and descriptive survey of PMs, the study determined thatPMs prioritise the traditional project parameters of cost, quality and time, consider andrefer to H&S more frequently during construction, than during procurement and designrelated occasions, generally consider and refer to H&S relative to various design relatedactivities, encounter design and procurement related situations which negatively affectH&S more frequently than situations which complement H&S. It also found that the potentialexists for various design, procurement and related aspects and actions to contribute toan improvement in H&S performance, and inadequate H&S negatively impacts on otherproject parameters and increases project risk.

Soetanto, R and Proverbs, D (2002) Modelling client satisfaction levels: the impact of contractor performance. Construction Economics and Building, 2(01), 13-27.